Description
Pars Saeed Ventilation Industries Co.
Cooling miner devices
Pars Saeed Ventilation Industries Co. with more than 23 years of experience in the design and production of industrial ventilation, according to the needs of the machines Maining to filtration systems and systems Cooling to increase efficiency rate, reduce energy consumption and reduce depreciation of these devices, construction Dedicated Air Conditioners Maining is based on their needs, which is one of the new achievements and adds importance of the company in line with its professional activities in line with the existing needs. Pars Saeed Ventilation Industries Co. is proud to be one of the pioneers in producing these products in its highest quality in Iran.
** Coolingbox of 198 pcs capacity miner machines **
The manufacturing engineering team of Pars Saeed Ventilation Industries Co. considering the amount of heat generated by the performance of each of these devices, the inlet discharge and the required output discharge, the amount of input temperature, the relative humidity based on the operating climate Maining Air ConditionersThe algorithm and the type and amount of airflow required inside the air conditioners Minerhas been calculated using the best software in the world and according to this important has designed and finally produced the best. Also, the company’s electrical engineering team along with its design team due to the high power consumption of the devices Mainingto standardize and optimize the functional environment of these devices Mainingin terms of voltage drop fluctuations, and immunization to prevent fire and connectivity, etc. It has.
Also, the design and engineering team of this company has divided its products into two main categories by studying different platforms, functions and different needs of different types of maining machines:
1- Air conditioner of mining machines with S9platform
2- Air conditioner of mainting machines with S11platform
Air conditioners with the ability to locate
- Series of air conditioners designed based on the platform and needs of miner S9 devices . With the ability to install M3-E10- E9– T9 and other minerdevices with similar design.
Types of capacities:
1- 6 devices
2- 36 devices
3- 54 devices
4- 99 devices
5- 198 devices
- Series of air conditioners designed based on the platform and needs of S11 miner devices. With the ability to install S15-S17-T17 and other miner devices with similar design.
Types of capacities:
1- 6 devices
2- 30 devices
3- 48 devices
Forming parts of the device
1- Industrial filtration
2- High efficiency water cooling system
3- Relative dehumidifier system
4- Mixing box clean air
5- Shelving for the establishment of devices
6- The exit site of the device air (hot air)
7- Permanent industrial exhaust fan direct work (without foley and tsama)
8- Main electrical panel
9- Copper billeting
10- Electrical insulation
11- Fuse and phase and noel terminal for each device
12- Inserting cable len switches for each device
**36 box of air conditioners and maining cooling systems**
Pars Saeed Ventilation Industries Co. is always trying to use the best, highest quality and most up-to-date parts and materials for its products. For the electric components of the air conditioner, the maining devices are used by brands such as Schneider Germany, which will provide the highest level of performance and safety of the air conditioners.
** Air conditioner and 15 capacity miner of Pars Saeed Ventilation Industries Co.**
Advantages of using air conditioners of Pars Saeed Ventilation Industries Co. for mining
– Very low power consumption compared to conventional samples
– Proper amperage division for the use of three-phase electricity
– Very low depreciation of the system
– Low noise due to reduction of fan fare from 6000 to 3000 rpm due to achieving optimal temperature
– No damage to electronic components due to proper filtering of air particles
– Supplying the inlet temperature to the system in the warmest summer period of 25 degrees Celsius
-18 months warranty of all hardware parts and internal fans
– Washable filters
– Increasing the lifespan of the system due to high production cooling and industrial filtration
– Permanent fan work and use bypass team with Air lock
– Ability to install channels towards fresh air up to 10 meters long
– Easy access to miner devices
– Built-in electric kit as well as related switches
– Using the best brands in the industrial electricity market such as LS and Schneider
– Occupying minimum space and providing appropriate access for work service
– The highest period of time required for periodic work service (every six months)
Share of electricity consumed by cryogenic kit and filtration of each device | Capacity | Fits for | Platform | Row |
0.4 Amp | 6 Device | S9
E9 E10 M3 |
HVAC A
S9 |
1 |
0.04 Amp | 36 Device | |||
0.05 Amp | 54 Device | |||
0.04 Amp | 198 Device | |||
0.5 Amp | 6 Device | S11
S15 S17 T17 |
HVAC B
S11 |
2 |
0.06 Amp | 15 Device | |||
0.07 Amp | 30 Device | |||
0.06 Amp | 99 Device |
Power consumption of air conditioners
Micro details and more detailed information of devices:
Due to the high energy loss of M3X mainmodel devices, the output efficiency of T/h 13 requires
Cryogenic kit and higher amperage tolerance strength are specific to this product compared to other samples
Row | Refriation kit capacity for M3X devices | Share of electricity consumed by cryogenic kit for each device (amp) |
1 | 6 Device | 0.5 |
2 | 36 Device | 0.3 |
3 | 54 Device | 0.1 |
4 | 198 Device | 0.04 |
In case of using more up-to-date miner systems due to less energy loss, air conditioners and coolants of maining machines will cause higher performance efficiency and consume less electricity share.
According to the designed cooling type which is evaporative (blue), the temperature that is predicted in the hottest performance state is 24 degrees and at the lowest is 15 degrees, which will determine the relative humidity of 40 to 50 percent required by the maining machines. It is worth noting that these figures are announced relatively.
?What is the technical complexity of the resulting product
– The urgent need of the devices to discharge the hot air produced by the performance of the devices and cool it while increasing the efficiency of each device
– The necessity of filtering the inlet air to the system due to the sensitivity of the systems and controlling the boards of the device
– The necessity of controlling the internal humidity resulting from the performance of air conditioners
– High sensitivity of devices to properly adjust amperage and electrification system
– Necessity to minimize power consumption to perform ventilation system
– High noise produced by each device while operating and the necessity of minimizing it according to the needs of environments with high sound sensitivity
According to the above mentioned cases to compare the air conditioners and coolants of mining machines of Pars Saeed Ventilation Industries Company with chiller and compression systems that create dry air with lower temperature and inject in the environment should be taken into consideration as follows:
The heat or thermal maining machines that create are equivalent to btu 6000 or half tons of refrigeration, which because in these systems we do not have fresh air and the system is generally based on circulation, the total power of refrigeration should be considered 12000btu or one ton of refrigeration so that we can put this complex in the safest possible way.
According to this important, we will consume 1.5 to 4A of energy per tonne of refrigeration depending on the type of chiller and power consumption. That is, 100 tons of refrigeration will be needed for 100 S9J devices, which will receive 150 amps of energy at the lowest.
The price of compressive systems or chillers from tons of refrigeration (for a device) is estimated between 7,000,000 to 16,000,000, depending on the power consumption technology and climatic conditions, the position of the device is determined and requires a detailed case expert. For example, for 100 tons of refrigeration (for 100 devices) between 700,000,000 million to 1,600,000,000 million Tomans is estimated to cost.
In contrast, using evaporative cooling systems specific to mining machines of Pars Saeed Ventilation Industries Co. for cooling each device, the average price is between 1.400,000 Tomans to 3,200,000 depending on the type of mining machines estimated, which will be more cost effective and economical in terms of initial cost and energy consumption
—-
Also, to know the specifications of other types of miner air conditioners including “dual capacity air conditioner” and “four-capacity air conditioner” and “higher capacity air conditioners”, 54-capacity air conditioner and hexagonal air conditioner” is enough to click on the name of each